Contact us
Location:
Motru, Gorj County
Land:
Surface rights contract for two plots of approximately 7.8 hectares each (30 years)
Installed Capacity:
4 MW per park (total 8 MW)
Inverter Capacity:
2.7 MW per park (total 5.4 MW)
Storage Capacity:
1 MW per park (total 2 MW)
Status:
“Ready to Build”
Key Achievements:
  • Developed two photovoltaic parks to “Ready to Build” status in August 2024
  • Secured long-term surface rights, ensuring project stability for 30 years
  • Strategically enhanced energy storage capacity to support grid stability and operational efficiency
Project summary:

The Motru Solar Parks 1 & 2 (2024) project in Gorj County was successfully developed on two plots of approximately 7.8 hectares each under a 30-year surface rights contract. With an installed capacity of 4 MW per park (total 8 MW), an inverter capacity of 2.7 MW per park (total 5.4 MW), and a storage capacity of 1 MW per park (total 2 MW), the project reached “Ready to Build” status in August 2024. Goldbach Energy secured long-term surface rights, ensuring project stability, while integrating advanced energy storage solutions to enhance grid stability and operational efficiency, contributing to Romania’s transition to sustainable energy.

Our work

Holding top projects

Șimian Solar Parks 1 & 2 (2023)

The Șimian Solar Parks 1 & 2 (2023) project in Mehedinți County was successfully developed on a 9-hectare site under a 25-year surface rights contract, with an installed capacity of 6 MW per park (total 12 MW) and an inverter capacity of 5 MW per park. Achieving “Ready to Build” status within the 2022-2023 period, the project involved land acquisition, design, and permitting phases, ensuring compliance and efficiency

project-image Explore more
Motru Solar Parks 1 & 2 (2024)

The Motru Solar Parks 1 & 2 (2024) project in Gorj County was successfully developed on two plots of approximately 7.8 hectares each under a 30-year surface rights contract. With an installed capacity of 4 MW per park (total 8 MW), an inverter capacity of 2.7 MW per park (total 5.4 MW), and a storage capacity of 1 MW per park (total 2 MW), the project reached “Ready to Build” status in August 2024.

project-image Explore more
contact-form-bg contact-form-bg-mobile
contact us
Let’s get in touch
Contact form
Contact information

    By providing your information, you agree to the Privacy Policy.

    Thank You for Reaching Out!

    If you have any additional inquiries, feel free to reach out to us via email or phone, as listed on our website.

    address
    159-165 CaleaFloreasca, ONE Tower, Bucharest