Șimian Solar Parks 1 & 2 (2023)
- Achieved “Ready to Build” status within the 2022-2023 period
- Successfully completed land acquisition, design, and permitting phases
- Delivered high-quality projects to the new owner for construction and operation
The Șimian Solar Parks 1 & 2 (2023) project in Mehedinți County was successfully developed on a 9-hectare site under a 25-year surface rights contract, with an installed capacity of 6 MW per park (total 12 MW) and an inverter capacity of 5 MW per park. Achieving “Ready to Build” status within the 2022-2023 period, the project involved land acquisition, design, and permitting phases, ensuring compliance and efficiency. The fully developed solar parks were sold at the Ready-to-Build stage, allowing the new owner to proceed with construction and operation, contributing to Romania’s growing renewable energy sector.
Holding top projects