Motru Solar Parks 1 & 2 (2024)
- Developed two photovoltaic parks to “Ready to Build” status in August 2024
- Secured long-term surface rights, ensuring project stability for 30 years
- Strategically enhanced energy storage capacity to support grid stability and operational efficiency
The Motru Solar Parks 1 & 2 (2024) project in Gorj County was successfully developed on two plots of approximately 7.8 hectares each under a 30-year surface rights contract. With an installed capacity of 4 MW per park (total 8 MW), an inverter capacity of 2.7 MW per park (total 5.4 MW), and a storage capacity of 1 MW per park (total 2 MW), the project reached “Ready to Build” status in August 2024. Goldbach Energy secured long-term surface rights, ensuring project stability, while integrating advanced energy storage solutions to enhance grid stability and operational efficiency, contributing to Romania’s transition to sustainable energy.
Holding top projects
Thank You for Reaching Out!
If you have any additional inquiries, feel free to reach out to us via email or phone, as listed on our website.

